Skip to content

Process Orchestrator (PO)


The Process Orchestrator is a highly configurable tool that supports orchestration of Prophet components. The Process Orchestrator allows customers to define their own linear processes to execute Prophet components and some other actions such as copying files. The Process Orchestrator has a user interface for customers to define processes, initiate processes, and record approvals. The Process Orchestrator web API integration layer allows other applications to interact with and support Process Orchestrator processes.

Process Orchestrator is specifically designed to control the following Insurance Risk Suite solutions and modules:

  • Data Conversion System
  • Assumptions Manager
  • Enterprise Manager
  • SQL Connector
  • Data Repository
OverviewSystem CompatibilityBest Practice
Process Orchestrator is a specialised workflow tool that connects with the various components of the FIS Insurance Risk Suite to automate the execution of actuarial models and results delivery.

Process Orchestrator can be integrated with other systems or workflow tools through rest services, so a process can be started with a service call, and intermediate steps in the process can interact with external systems by using external integration steps. This allows Process Orchestrator to be a stand-alone product for executing Insurance Risk Suite-based workflows, or it can be embedded in a larger workflow driven by other workflow engines.


Note: The functionality that users can view and use depends on the role that has been assigned to them.


To make best use of Process Orchestrator you should have a basic understanding of applications in the FIS Insurance Risk Suite. User guides for the Insurance Risk Suite applications are provided as part of the installation process for those applications.

The information is provided by FIS.

Prophet Enterprise and Results Database Support

PE / PRD
PO 2020 Q2 2021 Q2 2022 Q1 2023 Q2 2024 Q4
2022 Q3
2023 Q2
2024 Q4

Insurance Data Repository Support

PO IDR 2020 Q2 IDR 2021 Q2 IDR 2022 Q1 IDR 2022 Q2 IDR 2023 Q2 IDR 2024 Q4
2022 Q3
2023 Q2
2024 Q4

Windows Server Operating System

PO Server 2016 Server 2019 Server 2022
2022 Q3
2023 Q2
2024 Q4

SQL Server

PO SQL 2016 SQL 2017 SQL 2019 SQL 2022
2022 Q3
2023 Q2
2024 Q4
We have extensive experience in implementing Process Orchestrator, and our design optimizes the PO efficiency. Before using PO, it is critical to enhance the overall processes, such as

  • Centralizing DCS programs
  • Centralizing Prophet model and workspace
  • Efficient Prophet table management
  • Utilizing PE parameters
  • PE optimization
  • Efficient Prophet result output

Feel free to contact us for further discussion.